by Steve Banks | Sep 4, 2019 | Latest News
the 6inch Pioneer tool negotiated challenging pipelines onshore China and reached up to max speeds of 25m/s without significant damage.
by Steve Banks | Sep 4, 2019 | Latest News
Preparing the 12inch Pioneer run prior to launch.
by Steve Banks | Sep 3, 2019 | Latest News
A successful inspection run with an 8inch SmartFoam run offshore Indonesia. Great data on the subsea pipeline and flexible riser.
by Steve Banks | Sep 2, 2019 | Latest News
i2i are successfully running smart pigs through Argus valves to inspect pipelines otherwise considered un-piggable or uneconomical to make piggable. i2i can now inspection lines from 3inch and up using these tools.
by Steve Banks | Jul 27, 2019 | Latest News
i2i, with our clients in Canada, successfully launched the first 3inch Pioneer pig through a pig valve to inspect a pipeline. No requirement to dig, cut, and flange the pipeline to run a tethered tool and cost savings will be significant. Still some way to go to...
Recent Comments