Industry 1st ? Inspecting into a T joint

Industry 1st ? Inspecting into a T joint

i2i carried out the successful inspection of a 10″ pipeline that joins a 16″ pipeline at a T joint. A 10″ SmartFoam was used to inspect the 10″ pipeline that then dropped into the 16″ pipeline. The 10″ SmartFoam was then cleaned out...
Tank Farm 24″ Pipeline Inspection

Tank Farm 24″ Pipeline Inspection

i2i recently carried out the inspection of traditionally unpiggable sections of a pipeline within a tank farm. The standard 24″ Pioneer tool was blown through the pipeline with air from a compressor using specially made launchers and receivers. 4 pipeline...